Public Safety Facility

Posted on: June 6, 2025

[ARCHIVED] Public Safety Facility Update 6/6/25

Public Safety Facility Newsflash

What happened recently:

  • Exterior brick and stone is being installed on all sides of the facility 
  • Interior work continues including framing, plumbing, electrical, and mechanical work.
  • Interior doors are being installed
  • Underground utility work will continue and be done in coordination with the roadway project on Engler Blvd

What is coming up:

  • Interior work, including framing, sheet rocking, and electrical/mechanical/plumbing will continue
  • Interior painting in certain areas will begin

Exterior stone installStone Install at the Public Safety Facility

Interior FramingInterior Framing at the Public Safety Facility

Underground Utility WorkUnderground Utility Work at the Public Safety Facility

Why a new building?

When the planning process started, we looked at this project as a remodel and addition to the current fire station. As we went through the structural analysis, it was determined that due to the foundation and design of the current building, parts of it would need to be demolished and then rebuilt.

Because a part of the building would need to be demolished in order for us to add on, it ended up being a similar cost to build a new building. With a new building, we also have some additional benefits:

  • more efficient use of space
  • long-term maintenance for new building is more cost effective
  • reduces construction timeline
  • provides flexibility for the future